Fixing the new white guttering
Waiting for rain. !!!!!!
A mostly pictorial blog about the day to day life in our beautiful Oasis - El Rio De Aguas, Almeria, Spain.
Monday, 21 May 2012
Wednesday, 9 May 2012
Tuesday, 8 May 2012
Today we started to replace the roof of Femia's backroom.
The tiles from the old roof, ready to be replaced.
The old roof has gone. ! Big clean up. !
Dashinka under one of the new beams on the move.
Pepa is in the light.
The old roof has gone. ! Big clean up. !
Dashinka under one of the new beams on the move.
Pepa is in the light.
Monday, 23 April 2012
New, enlarged solar oven is taking shape with entrance for pots from the back and not from the top. The top will be doubled glazed and we will have a second plywood box inside the first box, insulated with sheep's wool, and then a metal box over the inside plywood box. The metal box will be painted black. I am looking for 200 degrees centigrade. ! My other box does 125 to 150 degrees centigrade. !
Tuesday, 17 April 2012
Sunday, 15 April 2012
Saturday, 14 April 2012
Sunday, 11 March 2012
Thursday, 8 March 2012
A new Charge Controller
This is a new "state of the art", charge controller. It takes in a high voltage from the panels and is able to gain up to 30% on panel efficiency. This is great step forwards in charge controller design.
Cooking. The price of gas is going up and up. We may hit 20 Euros a bottle so alternative sources of heat for cooking are now an economic necessity. This is going to be fun. !
Peter putting the parabolic together.
Solar Box Cooker. Today, a kind'a cloudy day, we hit 100 degrees. Apparently, in good conditions we can get 200 Centigrade, !
David checking out the new cookers.
Cooking in heaven. 5 liters of water will rise to the boil in 17 minutes. Fried eggs and bacon? This is great cooker. !!
Outdoor bread, chicken, or pizza oven. Small amount of wood burnt inside produces good heat.
Solar Box Cooker. Today, a kind'a cloudy day, we hit 100 degrees. Apparently, in good conditions we can get 200 Centigrade, !
David checking out the new cookers.
Cooking in heaven. 5 liters of water will rise to the boil in 17 minutes. Fried eggs and bacon? This is great cooker. !!
Outdoor bread, chicken, or pizza oven. Small amount of wood burnt inside produces good heat.
Pepa's project . Re-laying stone outside the Almacen in the Pizza area. !
Pepa on the job. Soften your eyes and see the magic garden. !
Francisco delivering sand and cement.
Unloading sand.
Francisco delivering sand and cement.
Unloading sand.
Life is good in the Gardens. !
Preparing for the planting of the Orange Tree
Subscribe to:
Posts (Atom)